Frequently asked questions
What is multi-level BOM pegging?
Material pegging links each requirement to stock, a receipt or a work order. MultiPeg follows the bill of materials across levels so you can see shared components and the customer orders they put at risk.
How do I run material shortage analysis?
Import your BOM, stock, receipts, production and customer orders as CSV or Excel. Open an at-risk order to trace the shortage to the component and the date it was needed. Export the allocation ledger to review the details.
How does the BOM shortage calculator handle late receipts?
Remaining receipts may be pegged to past-due requirements. The quantity remains short on the need date. Work orders that lack components at start are evaluated against the fixed plan.
Are my files uploaded?
Your files and results stay in the tab. Processing takes place in your browser with no account or data upload. Download your results before closing the page.
Planning conventions and limits
- One site per analysis, with no transfers. Use a consistent unit per item. Items measured in eaches are indivisible. A blank site or unit inherits the dataset value where available.
- Opening stock is available from the start. Each row is a distinct lot. Fill in a separate reference for each lot if you supply one. Receipts are independent of work orders and available on the stated date.
- The BOM must be acyclic across all versions. Validity dates are inclusive. All components are required at the work order start. Production takes at least one day.
- Work orders reserve components first, by start date, then priority, finish and source line. Output can feed another order on its finish date. Excess reservations remain attached to an incomplete work order.
- Customer orders share the balance by ascending priority (0 is highest), due date, then source line. Each requirement takes the oldest available lot first.
- Late allocations use the balance after all on-time reservations. Customer orders come first, followed by production requirements. They never release a work order that missed its start.
- Links to blocked work orders explain a residual shortage. Component quantities at this level belong to the entire work order and may affect several customers.
- Calendar dates, exact quantities to six decimal places and case-sensitive references. The plan is fixed, with no rescheduling, new orders, substitution, unit conversion, finite capacity or global optimization.
40,000 input rows, 120,000 requirements, 180,000 links and 16 levels. Quantities range from zero to 100 million per row. The structure export is limited to 100,000 rows.